ci: split primary gates into broad lanes

This commit is contained in:
Tianyi Cui
2026-07-06 02:22:22 +08:00
parent c64eca451c
commit 7cd4868056
9 files changed
+98 -22

No files matched your search

@@ -54,7 +54,7 @@ The repo secret is named `DEEPSEEK_API_KEY_EXTERNAL`; it is mapped to the `DEEPS
### Scope, runtime shape
Run **only** `test:e2e`. The keyless gates (typecheck/lint/coverage/snapshot/build/hygiene) already run in ci.yml on every push and PR; repeating them here would duplicate signal and slow the real-API job. No build step — e2e tests run unbuilt via tsx + the tsconfig paths map. Single Node 24 (the `engines` floor): these tests exercise *API integration*, not node-version compat, which ci.yml's Node 24/26 jobs already own; a second Node version would double real-API calls for no added signal. `vitest.e2e.config.ts` runs files through a bounded worker pool (`DSH_E2E_MAX_WORKERS`, default `4`, CI value `8`) so CI and local with-key runs parallelize independent files while retaining a one-line serial escape hatch for quota investigations. `timeout-minutes: 45` bounds a wedged run given 120s/test and `retry: 2`. `cancel-in-progress` is enabled only for `pull_request` runs — a superseded PR run is on a stale commit and worth cancelling, whereas a push/schedule run is already producing the post-merge/nightly signal and is never cancelled.
Run **only** `test:e2e`. The keyless gates (typecheck/lint/coverage/snapshot/build/hygiene) already run in ci.yml on every push and PR; repeating them here would duplicate signal and slow the real-API job. No build step — e2e tests run unbuilt via tsx + the tsconfig paths map. Single Node 24 (the `engines` floor): these tests exercise *API integration*, not node-version compat, which ci.yml's Node 24/26 jobs already own; a second Node version would double real-API calls for no added signal. `vitest.e2e.config.ts` runs files through a bounded worker pool (`DSH_E2E_MAX_WORKERS`, default `4`, CI value `12`) so CI and local with-key runs parallelize independent files while retaining a one-line serial escape hatch for quota investigations. `timeout-minutes: 45` bounds a wedged run given 120s/test and `retry: 2`. `cancel-in-progress` is enabled only for `pull_request` runs — a superseded PR run is on a stale commit and worth cancelling, whereas a push/schedule run is already producing the post-merge/nightly signal and is never cancelled.
## Security